Soekarno-Hatta has three runways aligned north-east–south-west: two parallel main runways and a third runway added in 2019.

Apron and runway at dusk — photo Seeharee, CC0 (Wikimedia Commons).

Key facts

Detail Information
Directions 07R/25L, 07L/25R and 06/24
Longest runway 07R/25L — 3,660 m
Second runway 07L/25R — 3,600 m
Third runway 06/24 — 3,000 m
Surface Asphalt

Runway directions

The runways are designated by their compass directions: 07R/25L and 07L/25R for the parallel pair, and 06/24 for the third runway.

Runways in detail

Runway Length Notes Status
07R/25L 3,660 m Northern parallel runway In use
07L/25R 3,600 m Southern parallel runway In use
06/24 3,000 m Third runway, operational since 15 August 2019 In use

Capacity and taxiways

  • The apron can serve up to 60 aircraft, up from 40 before the Terminal 3 expansion.
  • The east cross taxiway, opened in December 2019, links the two main runways.
  • Aircraft movements rose from 72 to 86 per hour after the east cross taxiway opened.

Airfield development

The third runway and the east cross taxiway were completed under the airport’s expansion programme.

Plans for a fourth terminal were scrapped in November 2024 in favour of optimising the existing terminals.

All terminalsArrivals