Soekarno-Hatta replaced Kemayoran Airport, Jakarta’s crowded city-centre airport, and has grown into the busiest airport in Indonesia.

Tropical garden and Javanese pavilion at Terminal 2, the Aga Khan Award-winning landscaping.
Garden and pavilion at Terminal 2 — photo Gunawan Kartapranata, CC BY-SA 4.0 (Wikimedia Commons).

Background

By the late 1960s Kemayoran could no longer expand. With USAID assistance, eight sites were evaluated, and a location at Benda in North Tangerang was chosen for the new international airport. Construction ran in two phases between 1975 and 1985; the airport began domestic operations on 1 May 1985 and took over international flights from Halim Perdanakusuma in 1991.

Expansion and design

Terminal 3 construction started in phases from 2009 and was completed as Terminal 3 Ultimate in 2016; the airport railway and the third runway followed. Terminals 1 and 2 were designed by French architect Paul Andreu, combining Javanese pendopo pavilions with tropical gardens — a concept that won the 1995 Aga Khan Award for Architecture.

Project phases

PhaseYearDescriptionStatus
Phase 11 May 1985Opening of Terminal 1, capacity 9 million passengers per yearCompleted
Phase 211 May 1991Opening of Terminal 2, capacity 18 million passengers per yearCompleted
Phase 315 April 2009Terminal 3 phase 1, capacity 22 million passengers per yearCompleted
Freight terminal—Fully built new freight terminal (north-west section)Pending
Phase 49 August 2016Terminal 3 Ultimate complete, capacity 43 million per year, airport railway, third runway, east cross taxiwayCompleted
Airport railway2016Construction of the airport railwayCompleted
Third runway2019Construction of the third runwayCompleted
Phase 52022Refurbishment of Terminals 1 & 2 to raise capacity to 61 million per yearIn progress

Key dates

  • 1985 — domestic operations begin on 1 May.
  • 1991 — international flights move from Halim Perdanakusuma.
  • 2016 — Terminal 3 Ultimate opens.
  • 2019 — the third runway becomes operational.

Airlines

  • Garuda Indonesia — hub airline at the airport.
  • Batik Air, Lion Air, Citilink and Indonesia AirAsia — major Indonesian carriers.
  • Sriwijaya Air, Super Air Jet, TransNusa, NAM Air and Pelita Air — additional domestic operators.

All terminalsSee Terminal 1

Close Welcome Bar