Terminal 3
Terminal 3 is the airport’s newest and largest terminal. The original terminal opened in 2011 and was rebuilt as Terminal 3 Ultimate, officially opened on 9 August 2016.

Key facts
| Detail | Information |
|---|---|
| Opened (current form) | 9 August 2016 (Terminal 3 Ultimate) |
| Floor area | 422,804 m² |
| Capacity | Built to handle 25 million passengers per year |
| Check-in counters | 112 |
| Aerobridges | 59 |
| Gates | 10 international, 18 domestic and 10 bus gates |
Design
Unlike the Javanese-inspired Terminals 1 and 2, Terminal 3 uses a contemporary glass-and-steel design. The west pier was extended in 2018 with eight additional aerobridges.
- Contemporary architecture — glass and steel façades replace the pendopo style.
- West pier extension — eight new aerobridges since 2018.
- Eco-friendly systems — natural lighting and ventilation throughout.
Facilities
- Self-service check-in machines and staffed counters.
- Level-5 baggage handling screening and extensive CCTV security systems.
- Restaurants, cafés and duty-free shops on the commercial levels.
- Internet access; the current network is posted on site.
Getting to Terminal 3
The free Skytrain connects Terminal 3 with Terminals 1 and 2 and the airport station; taxis and drop-off lanes serve the terminal directly.