Home » Terminal 3

Terminal 3

Terminal 3

Terminal 3 is the airport’s newest and largest terminal. The original terminal opened in 2011 and was rebuilt as Terminal 3 Ultimate, officially opened on 9 August 2016.

Aircraft parked on the apron beside Terminal 3.
Apron beside Terminal 3 — photo Gunawan Kartapranata, CC BY-SA 3.0 (Wikimedia Commons).

Key facts

DetailInformation
Opened (current form)9 August 2016 (Terminal 3 Ultimate)
Floor area422,804 m²
CapacityBuilt to handle 25 million passengers per year
Check-in counters112
Aerobridges59
Gates10 international, 18 domestic and 10 bus gates

Design

Unlike the Javanese-inspired Terminals 1 and 2, Terminal 3 uses a contemporary glass-and-steel design. The west pier was extended in 2018 with eight additional aerobridges.

  • Contemporary architecture — glass and steel façades replace the pendopo style.
  • West pier extension — eight new aerobridges since 2018.
  • Eco-friendly systems — natural lighting and ventilation throughout.

Facilities

  • Self-service check-in machines and staffed counters.
  • Level-5 baggage handling screening and extensive CCTV security systems.
  • Restaurants, cafés and duty-free shops on the commercial levels.
  • Internet access; the current network is posted on site.

Getting to Terminal 3

The free Skytrain connects Terminal 3 with Terminals 1 and 2 and the airport station; taxis and drop-off lanes serve the terminal directly.